Sectors | EducationNewsStructural

Heath Farm School

30 June 2016 | Sectors | Education, News, Structural

This was the first phase of the redevelopment of Heath Farm School at Charing Heath, Kent.

CTP were responsible for the foundation design, drainage and infrastructure works.  The timber framed super structure was by a specialist sub-contractor.

The foundations were trench fill although special measures had to be taken to bridge old wells found under the building footprint.