The steel frame erection is progressing well at the Marshall Sixth Form Centre.
CTP have provided Structural and Civil Engineering Design Services for the new flexible teaching block.
28 January 2021 | Sectors | News, Structural
The steel frame erection is progressing well at the Marshall Sixth Form Centre.
CTP have provided Structural and Civil Engineering Design Services for the new flexible teaching block.
17 November 2020
Ladywood, Ivy Hatch, Sevenoaks
9 June 2020
25 February 2020
2 December 2019
29 November 2019
Building Sussex Connections Property Networking Event
4 November 2019
Acton Gardens Construction Event
28 October 2019