Sectors | EducationNews

The Cavendish School

4 July 2016 | Sectors | Education, News

A Classroom and Theatre Block constructed on the site of an existing car park to the front of the school.  The structure is a steel frame concrete upper floors, and reinforced concrete slabs and ground bearing on piles.  Vehicular access has been maintained to the front of the School through a drive through formed below the new building.  The ground floor slabs were designed to take construction traffic because of the limited access to this inner city site.