Sectors | EducationNewsStructural

Tonbridge School – Gym and Extension Refurb

4 July 2016 | Sectors | Education, News, Structural

The relatively recent development of the Sports Centre at the school was so successful that previous office space was claimed to provide further gym space at lower ground floor.

This was achieved by forming a stair between ground and basement and at the same time providing additional external side space in the form of a pavilion adjacent to the running track.  The latter a modular structure constructed on new foundations and a retaining wall adjacent to the track cut into the bank.