Sectors | FeaturedResidentialStructural

Kings Square Phases 1 and 2

10 May 2019 | Sectors | Featured, Residential, Structural

Photograph of King Square Phase 1 Residential Scheme in Islington.  The project provided 47 new flats on the existing estate.  The two new ’L’ shaped buildings were constructed from an RC frame up to the first floor with a light gauge steel frame above.

Photograph of King Square Phase 2 under construction.  The second phase of the redevelopment provides 93 flats on the site of the former school.  The project consist of three RC framed buildings, traditional terraced houses and refurbishment of the nursery located in Rahere House.