Bormla Ferry Landing Facility, Malta
The construction of a berthing and waiting facilities to maximise the utilisation of maritime transport within the Grand Harbour, Malta between Bormla and Valletta.
Construction of the platform is made up from a number of piles, with precast concrete beams and slabs across each pile to create a unified deck structure with reinforced concrete topping, tying the whole structure. The waiting facility comprises a travertine clad steel framework and insultation panels.
CTP assumed a central role in project management and overseeing the design and construction process.
For this project, CTP have undertaken the design of the gangways and specialised fender system.
CLIENT
Infrastructure Malta
SERVICES DELIVERED
Marine
CONTRACT VALUE
€2.8m